Zupt has announced its first major renewables contract for an offshore wind farm development off the coast of France.  

Difficult geophysical terrain requires drilling 10 meter wide sockets into the seabed. Next, sockets will be filled with sand to establish solid foundation prior to installation. A 20m tall subsea template set atop sand-filled sockets to serve as bases in which monopiles will be inserted. Zupt will develop, source, integrate and operate this complex sensor suite to monitor and ensure precise and accurate position of monopiles during installation. 

The sensor suite contains over 40 advances sensors. This includes cameras, lights, acoustic and mechanical proximity sensors, GNSS, multiplexors, and inertial measurement units. All are connected to the surface through a 10GB network architecture. 

The template will be relocated and utilized during each monopile installation, with permanently fixed sensors. Zupt’s development of this proprietary sensor technology provides a cost-effective and efficient solution. The sensors are specifically designed to optimize power distribution and communication while reducing overall project expenses. 

Zupt assigns a dedicated team to be present throughout the lifecycle of the project, just over 200 days. The team ensures operational efficiency and troubleshoots any issues in real time.  

With this installation project, Zupt is using innovative approaches and insights to successfully navigate subsea terrains. Zupt is contributing to expanding renewable energy as well as advancing wind farm installation methods. 

For more information, visit Zupt announces major renewable energy contract for offshore wind development